Road Closure Permit

Permit to temporarily close or excavate a road.

Fee
Calculated fee
Processing time
5 days
Sign-in
eFaas login
Issued document
Road Closure Permit

Instructions

Mark the closure area on the map and choose the dates. A fee is calculated from the number of days and whether excavation is needed.

Processing stages

5 days
  1. Submit application

    3 steps

    Complete the online form and submit your details.

  2. Document Review

    2 days
  3. Site Inspection

    3 days
  4. Final Approval

    2 days
  5. Issue digital document

    Verified with QR code

    Road Closure Permit

Required documents

1 document
  • Utility Provider No-Objection Letter (NOC)
    PDF, JPG, PNG · Max 5 MB
    Conditional required
Official document issued upon approval

Road Closure Permit

Document prefix: (PRM)266-RD QR verifiable online Valid for 30 days